HOME          LEED          ASHRAE          EPAct 2005         RESIDENTIAL         CONTROLS          FIND A SALES AGENT

Commercial Interiors

EAc1

1-4 Points

Optimize Energy Performance

Intent: Achieve increasing levels of energy consumption below the prerequisite standard to reduce environmental impacts associated with excessive energy use.

Toolbox

Lighting Controls

TER Values of ABL Products
Search for Fixtures by Required Efficiency
RT5 Energy Story
I-BEAM Energy Story

Free Software

USGBC Home Site

Requirements:

EAc1.1 - Lighting Power (1-3 points)

Reduce connected lighting power density below that allowed in ANSI/ASHRAE/IESNA Standard 90.1-2004 using either the Space-by-Space Method or by applying the whole building lighting power allowance to the entire tenant space.

% Reduction in LPD Points
15% 1
25% 2
35% 3

EAc1.1 - Lighting Controls (1 point)

Install daylight responsive controls in all regularly occupied spaces within 15 feet of windows and under skylights.

 ã Acuity Brands Lighting, Inc.     Comments   |  Site Terms